There seems to be little change to the exterior over the past month or so, but that does not mean no work has been accomplished. Every day the stone masons, the insulators, and the roofers have been working away at their appointed duties.


We decided to finish the outside fireplace so the roofers would not be delayed any longer and to notch out a place for the mantel after the rest was finished. We also notched the mantel in the back so its weight would be supported by the stone face instead of just some surface mounted corbels.

Also on Friday the sheetrock was delivered and place throughout the house. Most of the sheets are 12 feet long to accommodate the tall ceilings. In those rooms where only 10 feet tall sheetrock is needed, that too is supplied. I thought it interesting that the builders have effectively cut down on their work by fitting their supplies to their needs.
And finally, we received a sample cabinet door for us to decide if our design is exactly what we want. What we're trying to incorporate is a craftsman or mission style door with an arched top and v-board panel. This one is made in maple and will be painted. It will be used in the bathrooms, utility room, and in the hallway locker.