It is amazing how quickly the house is (literally) taking shape since the foundation slab was completed. In just two weeks we've moved from a flat piece of concrete on which only imaginary walls stood, to the current wooden skeleton of our future home.
Beginning on April 1st the trucks delivered loads of lumber and the crew began forming the first floor walls. Rain cause a slight delay initially, but this week it has been nothing but sunny skies and pleasant temperatures.
It is fascinating to watch as the men yell out sizes for the lumber to be cut and brought into position. Then with little thought of the height above the foundation they work to place the boards precisely and nail them into place.
Standing 25 feet above the ground, placing the ridge beam |
Step ceiling of the Dining Room |
Garage and Study windows to the left of the entryway |